Funding Products
Program A Large Renewable Energy Project Finance
$100M – $10B – Non Recourse Shovel-Ready, Notice To Proceed (NTP) status
Program A Renewable Energy Projects
Countries: USA and International
Loan Type: Debt and Equity
Construction only or Construction-to-Permanent loan.
Capital Stack: 85% / 15% LTC
85% Lender / 15% Client Equity
Interest Rate
Starts at 4% fixed and up. Capital Stack interest rate determined by project risk assessment, location, the strength of principals, and principal cash equity.
Term
Flexible: Currently up to 15 years but scalable to Project needs.
Dollar-Size Of Fundable Projects
Currently, $100 Million to $10 Billion USD.
Project Cost Payable Through Loan Proceeds:
Soft cost, Hard cost, Closing cost, Loan interest, Bridge loans.
Availability of First Tranche Schedule/Construction Phase Draw
45-90 Business days.
The Lender Source of funds: Private Money
Commodity fund, US and Intl
Borrowers Down Payment(“Cash Equity”)
Borrower and/or Sponsor to source Cash Equity however they are able: Borrower and or Sponsor the capital, Equity or Bridge Lender can be used to meet Down Payment Requirements.
Form: Cash
Down Payment/Equity Amount: Typically 15% of the Projects Capital expenditures.
Our Role: Review loan package documents for pre-underwriting understanding so as to meet the content data quality that the lender requires, comment on their energy design and test data, advise the client on the status of their application, and provide feedback if any additional data is needed.
Program B Large Project Finance ENERGY:
both Renewable Energy and Oil&Gas
$100M -$10B – Non Recourse Project is Shovel-Ready, NTP status
Program B Energy (Renewables and Oil&Gas) Projects
Countries: USA and International
Loan Type: Debt Only (Lender takes no Equity)
Construction only or Construction-to-Permanent loan.
Capital Stack: 98.5% / 1.5% LTC
Interest Rate
Starts at 2% fixed and up (determined by risk assessment, cash flow, and IRR)
Term
Flexible: 3 – 20 years (determined by Off-Take Agreements)
Dollar-Size Of Fundable Projects
Currently, $100 Million to $10 Billion USD.
Project Cost Payable Through Loan Proceeds:
Soft cost, Hard cost, Closing cost, Loan interest, Bridge loans.
Availability of First Tranche Schedule/Construction Phase Draw
45-90-120 Business days.
Lender Source Of Funds
Commodity fund, US and Intl
Borrowers Down Payment(“Cash Equity”)
Borrower and/or Sponsor to source Cash Equity however they are able: Borrower and or Sponsor the capital, Equity or Bridge Lender can be used to meet Down Payment Requirements.
Form: Cash
Down Payment/Equity Amount: Typically 1.5% of the Projects Capital expenditures.
Our Role:
Review loan package documents for pre-underwriting understanding so as to meet the content data quality that the lender requires, comment on their energy design and test data, advise the client on the status of their application, and provide feedback if any additional data is needed.
Program C Large Project Finance INFRASTRUCTURE
$100M -$10B – Non Recourse Project is Shovel-Ready, NTP status
Program C Infrastructure Projects
Countries: USA and International
Loan Type: Debt Only (Lender takes no Equity)
Construction only or Construction-to-Permanent loan.
Capital Stack: 98.5% / 1.5% LTC
Interest Rate
Starts at 2% fixed and up (determined by risk assessment, cash flow, and IRR)
Term
Flexible: 3 – 20 years (determined by Off-Take Agreements)
Dollar-Size Of Fundable Projects
Currently, $100 Million to $10 Billion USD.
Project Cost Payable Through Loan Proceeds:
Soft cost, Hard cost, Closing cost, Loan interest, Bridge loans.
Availability of First Tranche Schedule/Construction Phase Draw
45-90-120 Business days.
Lender Source Of Funds:
Commodity fund, US and Intl
Borrowers Down Payment(“Cash Equity”)
Borrower and/or Sponsor to source Cash Equity however they are able: Borrower and or Sponsor the capital, Equity or Bridge Lender can be used to meet Down Payment Requirements.
Form: Cash
Down Payment/Equity Amount: Typically 1.5% of the Projects Capital expenditures.
Our Role:
Review loan package documents for pre-underwriting understanding so as to meet the content data quality that the lender requires, comment on their project design and test data, advise the client on the status of their application, and provide feedback if any additional data is needed.
We can fund any type of Renewable Energy and Infrastructure project, such as:
- Alternative Renewable/Clean/Green Energy: Solar, Wind, Waste to Energy (WTE), GeoThermal, HydroElectric, Biodiesel, Ethanol
- Oil&Gas, Liquefied Natural Gas (LNG) plant
- Infrastructure: Transportation, Communications, Water and WasteWater, Municipal Solid Waste facilities
Application Checklist
See our application checklist on the application page below.